Smeaton basalt boulder removal

This project involved removal of exposed large basalt boulders over approx. 50 acres at a total of approx. 650ton with an excavator and tipper. The removed rock was then used to construct a north south/east west wind break for cattle. Holes created by removed rock were filled in with available top soil. The Reefinator was then used to roll/smooth over remaining rock within area to level out paddock in readiness for sowing. The paddock was then smudged, fertilised and sowed in readiness for summer crop. This property is used for grazing only.